Total Potential Cost Of A Contract

Sum of (1) the actual or estimated maximum cost of all fees, remuneration, and reimbursable expenses associated with a contract, and (2) actual or estimated maximum cost of all contracts issued to the same contractor for similar jobs within 12 months of the signing of the original contract.

Share your love

Leave a Reply